A practical process around each item
The value of an inspection system comes from what happens before and after a form is completed. The team needs to identify the right equipment, use an appropriate method, capture the findings and act on defects. Managers then need to understand the current equipment decision and retrieve the supporting record.
UniQorn Safety connects those tasks through an equipment record, published checklists, QR or NFC identification, inspection evidence, corrective actions and history. This guide follows that process using synthetic training equipment.
COMPLIANCE CONTEXT · GREAT BRITAIN
How digital inspection records support PUWER and LOLER
PUWER covers much more than record keeping: work equipment must be suitable, maintained and used by appropriately informed and trained people, with suitable protective measures. Where inspection is needed, its scope and frequency should reflect the risks. A digital register and checklist workflow can help organise checks and retrieve their evidence. They do not establish that the equipment or the inspection method meets every duty. HSE PUWER overview.
HSE distinguishes simple checks from inspections requiring records. It advises that inspection records be kept at least until the next inspection and recognises secure electronic records that can be made available to the enforcing authority. Configure access, retention and retrieval around the relevant record type and your organisation’s obligations. Do not assume one retention period covers every lifting-equipment document. HSE inspection guidance.
LOLER introduces specific duties for lifting operations and equipment, including planning and supervision. A pre-use or routine checklist is separate from a statutory thorough examination. That examination needs a competent person and an appropriate written report; serious defects can also trigger specific notification duties. The platform’s generic demonstration report has not been validated here as a statutory LOLER thorough-examination report. LOLER overview · Thorough examination guidance.
For a lifting-equipment deployment, agree the examination scheme, competent person’s role, required report fields, authentication, defect reporting and retention before relying on any digital examination process. The organisation must also implement physical precautions and act on unsafe findings. A schedule, photograph, QR label or green status cannot independently establish legal compliance or fitness for use.
This overview concerns the Great Britain framework. Confirm the rules applicable to your jurisdiction and equipment with the responsible competent person.
Part 1 of 7 · Everyone
Getting started
Find your workspace, understand your role and confirm the equipment before starting work.
Begin with your own authorised account. Select the correct organisation and open the Safety workspace. The Overview, Equipment and Setup tabs provide the main routes through the demonstration. Access depends on the Safety permissions assigned to your account; an administrator and an inspector may see different controls.
Agree who maintains the register, who approves checklist content, who performs inspections and who can restrict or release equipment. One person may hold more than one role, but each decision still needs an identifiable owner. Confirm the equipment code and description against the physical item. If the identity is uncertain, resolve that before recording an inspection.
Follow these steps
- Sign in and select your organisation.
- Open Safety and locate the equipment record.
- Confirm the item and your authorised role.
Check before moving on: The correct equipment record is open in the correct organisation.
Part 2 of 7 · Administrators and checklist owners
Equipment and checklists
Build the register and publish an appropriate checklist before asking an inspector to start.
Organise sites, areas and locations using names your team recognises. Create the equipment record with a unique code, useful description and appropriate equipment type. Keep demonstration items separate from operational assets. The type connects the item to applicable published checklists, so an incorrect type can send an inspector to the wrong questions.
A competent checklist owner should define the checks from the risk assessment, manufacturer instructions and the organisation’s approved inspection method. Configure required answers, measurements, evidence and failure conditions as appropriate. Publish and assign the approved version, then confirm it appears for the intended equipment. An inspection remains tied to the published version used when it started, helping preserve the meaning of historical answers.
Follow these steps
- Create the site hierarchy and equipment type.
- Register a clearly identified item.
- Review, publish and assign its checklist.
Check before moving on: The intended published checklist is available for the equipment.
Part 3 of 7 · Administrators and inspectors
QR and NFC identification
Use a camera scan or a phone tap to reach the equipment’s Safety record.
Physical NFC tapping is illustrated. Public demonstration QR codes are hidden.
QR labels and NFC tags are two routes into the same equipment workflow. A QR label is created in Safety and can be downloaded or printed. A supported writable NFC tag is commissioned through the local Windows reader bridge, written with the issued resolver link and verified. Inspectors then scan the QR code or tap a commissioned NFC tag with a compatible phone.
Check that the resolved page shows the expected equipment and organisation, then open equipment inspections. A label identifies a record; it does not prove the physical item is safe. Access checks still apply. If a code is unavailable, confirm the account, organisation and label status rather than assuming the equipment has passed. Replace damaged identifiers through the controlled process and verify the replacement. QR and NFC credentials can be revoked independently.
Follow these steps
- Create a QR label or commission an NFC tag.
- Attach it to the correct item and verify the destination.
- Scan or tap, confirm identity, then open inspections.
Check before moving on: Both identification methods lead authorised users to the intended equipment.
Part 4 of 7 · Inspectors
Carrying out an inspection
Record observations, measurements and evidence, then review before completion.
Choose the applicable published checklist and start or resume the correct draft. Perform the physical checks using the approved method. Record the actual condition observed, enter measurements in the expected units and attach relevant photographs where required. A photograph supports an observation; it is not a substitute for performing the check.
Save the draft as work progresses. Before completing it, review all required responses and evidence, including any failed answers. Complete the sign-off using the authorised inspector’s account and confirm that the server shows the completed record. A saved draft is unfinished work. A completed inspection with no recorded failures describes that inspection result; any existing equipment hold must still be reviewed separately.
Follow these steps
- Start or resume the intended checklist.
- Perform checks and save answers and evidence.
- Review, sign off and verify completion.
Check before moving on: A completed inspection has traceable answers, evidence and sign-off.
Part 5 of 7 · Inspectors, corrective-action owners and managers
Failures and equipment release
Keep the defect, corrective action and equipment decision connected.
When an inspection records a failure, review the linked corrective actions and current equipment safety gate. Apply the organisation’s stop-use, isolation, restriction or quarantine procedure immediately where needed. A digital status communicates a decision; it does not physically isolate machinery or replace site controls.
Record who owns the corrective work, the follow-up notes and the evidence supporting closure. Closing an action does not release equipment. In the demonstrated workflow, release requires all actions closed and a fresh passing inspection after corrective closure or the latest restriction. An authorised manager then records the release decision and reason. A passing inspection never automatically removes an existing hold. Review the current gate as well as the event history; historical colours describe earlier events.
Follow these steps
- Review the failure and apply physical site controls.
- Assign, resolve and document corrective work.
- Reinspect, then record an authorised release when eligible.
Check before moving on: The equipment decision remains explicit and traceable throughout follow-up.
Part 6 of 7 · Safety managers and administrators
Scheduling and oversight
Plan inspections and review due work, responsibilities and exceptions.
Define the inspection schedule from the equipment’s risks, operating conditions, manufacturer guidance and applicable examination scheme. Assign the relevant equipment, checklist and responsible people. Establish a clear response for missed work and for an inspector who is unavailable. A software schedule implements an agreed frequency; it does not determine whether that frequency is legally or technically sufficient.
Review due and overdue work alongside drafts, completed inspections and outstanding corrective actions. Check the current gate before deciding whether an item can be used. Confirm notification settings and recipients in the deployed organisation and test delivery where notifications are configured. Managers need a routine for acting on exceptions, rather than relying only on an automated reminder or a dashboard colour.
Follow these steps
- Agree the frequency and accountable people.
- Create and verify the schedule.
- Review due work, missed inspections and open actions.
Check before moving on: Planned work has a responsible owner and an agreed escalation route.
Part 7 of 7 · Field inspectors and record owners
Offline work and reports
Prepare before disconnecting, verify synchronisation and retain the inspection record.
Save the online draft first, prepare it on the intended device and open the prepared field inspection while connected. Verify that the answers and actual photographs are available. For Home Screen reopening, prepare and verify inside the same installed Safety Field app you will use offline; browser and installed-app storage can differ. Protect the device and use the local-work lock when appropriate.
After working offline, reconnect, unlock and sync saved device work. Resolve conflicting answers deliberately and verify the server’s receipt, final answers and evidence before treating the record as synchronised. Follow local stop-use procedures for unsafe findings while disconnected. Review the completed inspection report and linked history, then retain and retrieve records under the organisation’s policy. The illustrated offline sequence explains the process; the selected devices still need their own acceptance test.
Follow these steps
- Prepare and verify the draft online on the intended device.
- Save field work locally, then reconnect and sync.
- Check server receipt and retrieve the completed report.
Check before moving on: Field evidence is verified on the server and available for review.
Turn the demonstration into a controlled pilot.
Start with a defined equipment group, approved checklists and nominated people. Agree schedules, stop-use rules, release authority, record retention and fallback arrangements. Test both identification methods, evidence capture, failed inspections, corrective closure, reinspection and explicit release. Where offline work is needed, verify the complete process on each intended device before field use.
Keep training records separate from operational pilot acceptance. Record any gaps and the person responsible for resolving them before expanding the scope.
Discuss your Safety pilotFurther reading
- HSE — PUWER overview
- HSE — Inspection of work equipment
- HSE — LOLER overview
- HSE — Thorough examinations and inspections of lifting equipment
Guidance and interface references reviewed 18 October 2026. Review the content when the workflow, enabled features or applicable guidance changes.